• Skip to primary navigation
  • Skip to main content
  • Skip to primary sidebar
  • Skip to footer

Era Of Kashmir

Weekly Newspaper

  • Home
  • J&K
  • India
  • Opinion
  • Editorial
  • Columns
  • SOCIETY
  • Tourism
  • Education
  • e Paper
Home » Centre Clears 19 Mega Road Projects for J&K
Centre Clears 19 Mega Road Projects for J&K

Centre Clears 19 Mega Road Projects for J&K

By EoK Correspondent

JAMMU, June 23: In a landmark move set to transform Jammu and Kashmir’s infrastructure landscape, the Union Ministry of Road Transport and Highways (MoRTH) has approved 19 major road and tunnel projects worth ₹10,637 crore. Spanning a total length of 296 kilometers, these strategic initiatives promise to boost regional connectivity, economic development, and national security logistics in the Union Territory.

Lieutenant Governor Manoj Sinha expressed heartfelt gratitude to Prime Minister Narendra Modi and Union MoRTH Minister Nitin Gadkari for sanctioning the ambitious infrastructure plan under the National Highways Action Plan for 2025–26.

“These strategically important projects will significantly improve logistical support and troop mobility, besides strengthening the road infrastructure of the Union Territory,” said LG Sinha. “They will also connect various tourist destinations, reduce travel time through tunnels, ensure all-weather connectivity, and catalyze economic growth.”

Centre Clears 19 Mega Road Projects for J&K

Key Projects Approved:

The sanctioned projects include a mix of tunnels, flyovers, bypasses, and highway upgrades. Prominent among them are:

  • Peer Ki Gali Tunnel on NH-701A — ₹3,830 crore
  • Sadhna Tunnel on NH-701 — ₹3,330 crore
  • Zaznar-Shopian Section of NH-701A — ₹852 crore
  • Four-lane Flyover from Lal Chowk to Parimpora — ₹700 crore
  • Trehgam–Chamkote Section of NH-701 — ₹966 crore
  • Four-lane Magam Flyover on Narbal–Gulmarg section of NH-701A — ₹445 crore
  • Qazigund Bypass — ₹95 crore
  • Two-lane Bridge over Rambiara in Shopian (NH-444) — ₹71 crore

The package also includes several road safety initiatives across the UT.

In addition to the green-lit projects, the Ministry has also sanctioned the preparation of Detailed Project Reports (DPRs) and feasibility studies for further upgrades and constructions over the next three years. These include:

  • Widening and upgradation of NH-444 from Srinagar to Qazigund (63 km)
  • Construction of 2-lane with paved shoulders (2L+PS) road from Shopian to Magam on NH-701A (75 km)
  • 10.8 km-long Panjtarni Tunnel including approach roads (total 31 km)
  • Development of Domail–Katra–Bamla stretch of NH-144 to four-lane specifications (82 km)

The comprehensive development roadmap signals a significant leap in Jammu and Kashmir’s connectivity blueprint, which experts say will not only enhance economic potential but also support strategic and defense-related transportation in the sensitive border region.

Filed Under: J&K, Latest News Published on June 23, 2025

Primary Sidebar

Latest ePaper

Cover Stories

Champions at Last

Champions at Last

Published on March 4, 2026

How Jammu and Kashmir Conquered the Ranji Trophy and Rewrote Sporting History The afternoon sun baked the red soil of the KSCA Rajnagar Stadium in Hubballi as the final moments of India’s premier domestic cricket competition ticked away. For eight-time champions Karnataka, the fifth and final day was a grueling exercise in inevitability. For the […]

  • Slopes of Unity
  • A Valley Under Diagnosis
  • J&K: North India’s New Medical Hub
  • The Voltage Crisis
  • J&K Budget 2026: J&K Govt Announces Free LPG, Fee Waivers, and Jobs for the Poor
  • Budget Session: LG Unveils Roadmap for a Prosperous J&K
  • 77th Republic Day, J&K Redefines “Integration” Through Rail, Road, and Resolve
  • The Silent Ebb
  • Cloud, Code, and Connectivity
  • Year 2025: How J&K Moved Forward

More Posts from this Category

Education

Redefining Achievement in the Wake of the Winter Session

Published on March 5, 2026

A look back at the January results that shook the Valley, from the record-breaking speed of JKBOSE to the high cost of academic pressure. By Rayees Ahmad Kumar The transition of Jammu and Kashmir’s academic landscape into the 2026 calendar year was marked by a logistical feat that has since become the primary talking point […]

  • A Review of Majeed Masroor’s ‘Faizan-e-Nazar
  • The Dilemma of First Standard Admissions
  • Kashmir’s Pet Boom Demands Responsibility
  • Echoes of the Valley
  • Kupwara Revives Kashmir’s Poetic Tradition

Footer

About Us

Contact Us

e Paper

© 2005–2026 Era Of Kashmir